{"apiVersion":"1.0.0","budgetVersion":{"slug":"ppb2027","display_name":"Proposed UN Programme Budget for 2027, Peacekeeping Budget for 2026/2027 and Plan Outline 2026-2028","ppb_year":2027,"is_default":true,"sort_order":0},"coverage":["Budget citations describe recorded programme-budget references, not legal in-force status.","Missing extracted text does not establish that the original document contains no relevant provisions.","Resolution collections are related documents, not necessarily ordered versions or legal replacements.","Citation context is the selected budget cycle. Extraction and relationship coverage may be incomplete."],"document":{"symbol":"A/RES/79/297","title":"Strategic Heritage Plan of the United Nations Office at Geneva","issuingBody":"GA","year":2025,"documentType":"Resolutions","subjects":["Office Buildings","Geneva (Switzerland)","Maintenance and Repair","Project Management","Project Finance","Costs"],"agendaItems":{"numbers":["139"],"titles":["Proposed programme budget for 2025."]},"sourceUrl":"https://documents.un.org/api/symbol/access?s=A%2FRES%2F79%2F297&l=en&t=pdf","pageUrl":"https://mandates.un.org/mandate/A/RES/79/297?ppb_version=ppb2027","canonicalUrl":"https://mandates.un.org/mandate/A/RES/79/297","jsonUrl":"https://mandates.un.org/mandate/A/RES/79/297.json?ppb_version=ppb2027","budgetVersion":"ppb2027","matchingCitationCount":0,"matchingEntityCount":0,"matchingEntities":[],"matchingFoundationalEntities":[],"matchingProgrammes":[],"matchingBudgetLocations":[],"series":null,"group":null,"details":{"status":"included","citations":[],"budgetLocations":[],"foundationalEntities":[],"budgetLocationExpenditures":[],"entityCitationTotals":{},"entityExpenditures":{},"paragraphs":{"status":"available","language":"en","items":[{"extraction_quality_warning":false,"id":"0c567d16-8e44-5ba8-b005-bd6ad89e2d42","position":1,"note_ids":[],"note_references":[],"text":"Resolution adopted by the General Assembly on 30 June 2025","type":"frontmatter","heading_level":null,"paragraph_type":null,"paragraph_level":null,"prefix":null,"links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"258017e6-eebd-5fc9-a221-1b32b0d6a658","position":2,"note_ids":[],"note_references":[],"text":"[on the report of the Fifth Committee (A/79/652/Add.2, para. 6)]","type":"frontmatter","heading_level":null,"paragraph_type":null,"paragraph_level":null,"prefix":null,"links":[["A/79/652/Add.2","https://undocs.org/en/A/79/625/Add.2"]],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"09552d39-4e49-526f-bcc2-4036b03d48f7","position":3,"note_ids":[],"note_references":[],"text":"Strategic heritage plan of the United Nations Office at Geneva","type":"title","heading_level":null,"paragraph_type":null,"paragraph_level":null,"prefix":"79/297.","links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"ec0b0985-7b4b-5c69-b7ef-0d20705e2bb3","position":4,"note_ids":[],"note_references":[],"text":"The General Assembly,","type":"opening","heading_level":null,"paragraph_type":"preambular","paragraph_level":0,"prefix":null,"links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"13983922-65be-5281-af77-23b2a1738c79","position":5,"note_ids":[],"note_references":[],"text":"Recalling part XI of its resolution 64/243 of 24 December 2009, section VII of its resolution 66/247 of 24 December 2011, section V of its resolution 68/247 A of 27 December 2013, sections III and VII of its resolution 69/262 of 29 December 2014, section X of its resolution 70/248 A of 23 December 2015, section XVIII of its resolution 71/272 A of 23 December 2016, section XVI of its resolution 72/262 A of 24 December 2017, section XIII of its resolution 73/279 A of 22 December 2018, section VII of its resolution 74/263 of 27 December 2019, section IX of its resolution 75/253 A of 31 December 2020, section XVIII of its resolution 76/246 A of 24 December 2021, section VI of its resolution 77/263 A of 30 December 2022, section XIX of its resolution 78/253 of 22 December 2023 and section XVII of its resolution 79/258 A of 24 December 2024,","type":"paragraph","heading_level":null,"paragraph_type":"preambular","paragraph_level":1,"prefix":null,"links":[["64/243","https://docs.un.org/en/A/RES/64/243"],["66/247","https://docs.un.org/en/A/RES/66/247"],["68/247","https://docs.un.org/en/A/RES/68/247"],["69/262","https://docs.un.org/en/A/RES/69/262"],["70/248","https://docs.un.org/en/A/RES/70/248"],["71/272","https://docs.un.org/en/A/RES/71/272"],["72/262","https://docs.un.org/en/A/RES/72/262"],["73/279","https://docs.un.org/en/A/RES/73/279"],["74/263","https://docs.un.org/en/A/RES/74/263"],["75/253","https://docs.un.org/en/A/RES/75/253"],["76/246","https://docs.un.org/en/A/RES/76/246"],["77/263","https://docs.un.org/en/A/RES/77/263"],["78/253","https://docs.un.org/en/A/RES/78/253"],["79/258","https://docs.un.org/en/A/RES/79/258"]],"textWithHighlights":"*Recalling* part XI of its resolution 64/243 of 24 December 2009, section VII of its resolution 66/247 of 24 December 2011, section V of its resolution 68/247 A of 27 December 2013, sections III and VII of its resolution 69/262 of 29 December 2014, section X of its resolution 70/248 A of 23 December 2015, section XVIII of its resolution 71/272 A of 23 December 2016, section XVI of its resolution 72/262 A of 24 December 2017, section XIII of its resolution 73/279 A of 22 December 2018, section VII of its resolution 74/263 of 27 December 2019, section IX of its resolution 75/253 A of 31 December 2020, section XVIII of its resolution 76/246 A of 24 December 2021, section VI of its resolution 77/263 A of 30 December 2022, section XIX of its resolution 78/253 of 22 December 2023 and section XVII of its resolution 79/258 A of 24 December 2024,","mandates":[{"action_verb":"Recalling","action_verb_normalized":"recall","action_verb_type":"reinforcing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"c5be8a28-9735-5fcf-9a99-97e6a3a1f8cb","position":6,"note_ids":[1,2],"note_references":[{"offset":162,"note_id":1},{"offset":254,"note_id":2}],"text":"Having considered the update to the eleventh annual progress report of the Secretary-General on the strategic heritage plan of the United Nations Office at Geneva and the related report of the Advisory Committee on Administrative and Budgetary Questions,","type":"paragraph","heading_level":null,"paragraph_type":"preambular","paragraph_level":1,"prefix":null,"links":[],"textWithHighlights":"*Having considered* the update to the eleventh annual progress report of the Secretary-General on the strategic heritage plan of the United Nations Office at Geneva and the related report of the Advisory Committee on Administrative and Budgetary Questions,","mandates":[{"action_verb":"Having considered","action_verb_normalized":"consider","action_verb_type":"observing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"bae30595-12a0-56b4-9230-89394522b7f2","position":7,"note_ids":[],"note_references":[],"text":"Takes note of the report of the Secretary-General;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"1.","links":[],"textWithHighlights":"*Takes note* of the report of the Secretary-General;","mandates":[{"action_verb":"Takes note","action_verb_normalized":"take note","action_verb_type":"observing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"b31c11d5-f298-5ef1-b37a-1a2fa7e8740c","position":8,"note_ids":[],"note_references":[],"text":"Endorses the conclusions and recommendations contained in the report of the Advisory Committee;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"2.","links":[],"textWithHighlights":"*Endorses* the conclusions and recommendations contained in the report of the Advisory Committee;","mandates":[{"action_verb":"Endorses","action_verb_normalized":"endorse","action_verb_type":"deciding","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"6ef810ca-8180-5e22-b980-b5889ef59462","position":9,"note_ids":[],"note_references":[],"text":"Welcomes the continued support of the Government of Switzerland for the construction project in Geneva;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"3.","links":[],"textWithHighlights":"*Welcomes* the continued support of the Government of Switzerland for the construction project in Geneva;","mandates":[{"action_verb":"Welcomes","action_verb_normalized":"welcome","action_verb_type":"evaluative","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"449ce5ed-7ed4-55b8-aa80-e892f333a546","position":10,"note_ids":[],"note_references":[],"text":"Stresses the importance of close coordination between the strategic heritage plan project team and the Secretariat in New York, in particular the Global Asset Management Policy Service, to ensure success in all aspects of the project;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"4.","links":[],"textWithHighlights":"*Stresses* the importance of close coordination between the strategic heritage plan project team and the Secretariat in New York, in particular the Global Asset Management Policy Service, to ensure success in all aspects of the project;","mandates":[{"action_verb":"Stresses","action_verb_normalized":"stress","action_verb_type":"reinforcing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"66b2f962-089a-5ce2-a531-5215196b95c1","position":11,"note_ids":[],"note_references":[],"text":"Also stresses the importance of effective governance, oversight, transparency and accountability in the management of the project to ensure that the project objectives are achieved on time and within budget;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"5.","links":[],"textWithHighlights":"Also *stresses* the importance of effective governance, oversight, transparency and accountability in the management of the project to ensure that the project objectives are achieved on time and within budget;","mandates":[{"action_verb":"stresses","action_verb_normalized":"stress","action_verb_type":"reinforcing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"9ad56361-fb7e-5954-a961-3a846949d746","position":12,"note_ids":[],"note_references":[],"text":"Requests the Secretary-General to continue to ensure that the procurement of goods and services for the construction project is carried out in strict compliance with the existing regulations, rules and relevant provisions of General Assembly resolutions governing procurement in the United Nations;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"6.","links":[],"textWithHighlights":"*Requests* <<the Secretary-General>> to continue to ensure that the procurement of goods and services for the construction project is carried out in strict compliance with the existing regulations, rules and relevant provisions of General Assembly resolutions governing procurement in the United Nations;","mandates":[{"action_verb":"Requests","action_verb_normalized":"request","action_verb_type":"directive","assignees":[{"assignee":"the Secretary-General","assignee_normalized":"Secretary-General","assignee_type":"secretary-general"}],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"cac2ab67-d82d-5a44-adee-8f6a9ebd0cc3","position":13,"note_ids":[],"note_references":[],"text":"Also requests the Secretary-General to ensure that the project team takes vendors, notably from developing countries and countries with economies in transition, fully into account and to report on the specific steps taken and progress achieved in the context of increasing procurement opportunities for vendors from developing countries and countries with economies in transition in the implementation of the strategic heritage plan;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"7.","links":[],"textWithHighlights":"Also *requests* <<the Secretary-General>> to ensure that the project team takes vendors, notably from developing countries and countries with economies in transition, fully into account and to report on the specific steps taken and progress achieved in the context of increasing procurement opportunities for vendors from developing countries and countries with economies in transition in the implementation of the strategic heritage plan;","mandates":[{"action_verb":"requests","action_verb_normalized":"request","action_verb_type":"directive","assignees":[{"assignee":"the Secretary-General","assignee_normalized":"Secretary-General","assignee_type":"secretary-general"}],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"6d1e6776-e713-5ba1-ad4a-f8cc59a34c1c","position":14,"note_ids":[],"note_references":[],"text":"Further requests the Secretary-General to ensure that all activities promote cost-efficiency and transparency, are implemented within existing resources and in accordance with the United Nations legislative framework, including the Financial Regulations and Rules, while maintaining full accountability to the General Assembly;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"8.","links":[],"textWithHighlights":"Further *requests* <<the Secretary-General>> to ensure that all activities promote cost-efficiency and transparency, are implemented within existing resources and in accordance with the United Nations legislative framework, including the Financial Regulations and Rules, while maintaining full accountability to the General Assembly;","mandates":[{"action_verb":"requests","action_verb_normalized":"request","action_verb_type":"directive","assignees":[{"assignee":"the Secretary-General","assignee_normalized":"Secretary-General","assignee_type":"secretary-general"}],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"62272482-0303-5d4c-a037-985bb87dad16","position":15,"note_ids":[],"note_references":[],"text":"Requests the Secretary-General to ensure maximum utilization of building H;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"9.","links":[],"textWithHighlights":"*Requests* <<the Secretary-General>> to ensure maximum utilization of building H;","mandates":[{"action_verb":"Requests","action_verb_normalized":"request","action_verb_type":"directive","assignees":[{"assignee":"the Secretary-General","assignee_normalized":"Secretary-General","assignee_type":"secretary-general"}],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"8530b9e0-e9e1-517c-8877-ff84f6dacd6e","position":16,"note_ids":[],"note_references":[],"text":"Also requests the Secretary-General to ensure that any change that affects the scope of the strategic heritage plan project is presented for the consideration and decision of the General Assembly;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"10.","links":[],"textWithHighlights":"Also *requests* <<the Secretary-General>> to ensure that any change that affects the scope of the strategic heritage plan project is presented for the consideration and decision of the General Assembly;","mandates":[{"action_verb":"requests","action_verb_normalized":"request","action_verb_type":"directive","assignees":[{"assignee":"the Secretary-General","assignee_normalized":"Secretary-General","assignee_type":"secretary-general"}],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"9a3775d7-c760-5221-b18b-63b43adc31c2","position":17,"note_ids":[],"note_references":[],"text":"Notes with concern that the project has used a total of 92,917,000 Swiss francs in contingencies to date, and strongly reiterates that the use of the contingency provision should be tightly monitored and limited to the absolute minimum;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"11.","links":[],"textWithHighlights":"*Notes* with concern that the project has used a total of 92,917,000 Swiss francs in contingencies to date, and strongly reiterates that the use of the contingency provision should be tightly monitored and limited to the absolute minimum;","mandates":[{"action_verb":"Notes","action_verb_normalized":"note","action_verb_type":"observing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"4f73a57d-691c-5739-b3db-7f94c19bbee6","position":18,"note_ids":[],"note_references":[],"text":"Decides to approve a revised estimated cost of the strategic heritage plan in the maximum amount of 924,244,000 Swiss francs to implement the scope of the project as approved in its resolution 70/248 A;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"12.","links":[["70/248","https://docs.un.org/en/A/RES/70/248"]],"textWithHighlights":"*Decides* to approve a revised estimated cost of the strategic heritage plan in the maximum amount of 924,244,000 Swiss francs to implement the scope of the project as approved in its resolution 70/248 A;","mandates":[{"action_verb":"Decides","action_verb_normalized":"decide","action_verb_type":"deciding","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"a29b1eb3-5cfb-532a-a230-dce2358ae3d9","position":19,"note_ids":[],"note_references":[],"text":"Requests the Secretary-General to complete, within the revised budget, as set out in paragraph 12 above, and within the revised timeline for the project, the remaining construction elements that are both interdependent and required for code compliance and excluding items that are independent and beyond code compliance;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"13.","links":[],"textWithHighlights":"*Requests* <<the Secretary-General>> to complete, within the revised budget, as set out in paragraph 12 above, and within the revised timeline for the project, the remaining construction elements that are both interdependent and required for code compliance and excluding items that are independent and beyond code compliance;","mandates":[{"action_verb":"Requests","action_verb_normalized":"request","action_verb_type":"directive","assignees":[{"assignee":"the Secretary-General","assignee_normalized":"Secretary-General","assignee_type":"secretary-general"}],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"1d516fd1-7daa-5bb7-b399-87d12f062cb9","position":20,"note_ids":[],"note_references":[],"text":"Also requests the Secretary-General to ensure the substantial completion of the strategic heritage plan by 31 December 2027, and decides that any further increase in costs of the strategic heritage plan beyond the approved budget should be funded from voluntary contributions;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"14.","links":[],"textWithHighlights":"Also *requests* <<the Secretary-General>> to ensure the substantial completion of the strategic heritage plan by 31 December 2027, and decides that any further increase in costs of the strategic heritage plan beyond the approved budget should be funded from voluntary contributions;","mandates":[{"action_verb":"requests","action_verb_normalized":"request","action_verb_type":"directive","assignees":[{"assignee":"the Secretary-General","assignee_normalized":"Secretary-General","assignee_type":"secretary-general"}],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"1f343c30-b13d-5cd3-b9c0-81d2ecbc32a4","position":21,"note_ids":[],"note_references":[],"text":"Stresses that any increase to the maximum overall budget must be approved by the General Assembly before entering into corresponding financial commitments;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"15.","links":[],"textWithHighlights":"*Stresses* that any increase to the maximum overall budget must be approved by the General Assembly before entering into corresponding financial commitments;","mandates":[{"action_verb":"Stresses","action_verb_normalized":"stress","action_verb_type":"reinforcing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"a482f897-2fea-5231-80b7-eab9e2f52fd8","position":22,"note_ids":[],"note_references":[],"text":"Recalls paragraph 41 of the report of the Advisory Committee;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"16.","links":[],"textWithHighlights":"*Recalls* paragraph 41 of the report of the Advisory Committee;","mandates":[{"action_verb":"Recalls","action_verb_normalized":"recall","action_verb_type":"reinforcing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"f37a56b5-e845-55c9-bd6c-e8ec0c6f94ee","position":23,"note_ids":[],"note_references":[],"text":"Regrets further delays incurred in the project, and requests the Secretary-General to make utmost and every effort to strictly abide by the approved revised budget and schedule, including through tight cost control, regular and proactive review of risks, value engineering and cost-saving measures, notes such measures undertaken to date, and looks forward to receiving further information in his next progress report;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"17.","links":[],"textWithHighlights":"*Regrets* further delays incurred in the project, and requests the Secretary-General to make utmost and every effort to strictly abide by the approved revised budget and schedule, including through tight cost control, regular and proactive review of risks, value engineering and cost-saving measures, notes such measures undertaken to date, and looks forward to receiving further information in his next progress report;","mandates":[{"action_verb":"Regrets","action_verb_normalized":"regret","action_verb_type":"evaluative","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"4f3d4384-085e-51e6-a0c6-c5a0e86fecde","position":24,"note_ids":[],"note_references":[],"text":"Requests the Secretary-General to ensure maximum utilization of the renovated historical buildings, including by enabling Member States to fully utilize the Secretariat’s common meeting rooms;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"18.","links":[],"textWithHighlights":"*Requests* <<the Secretary-General>> to ensure maximum utilization of the renovated historical buildings, including by enabling Member States to fully utilize the Secretariat’s common meeting rooms;","mandates":[{"action_verb":"Requests","action_verb_normalized":"request","action_verb_type":"directive","assignees":[{"assignee":"the Secretary-General","assignee_normalized":"Secretary-General","assignee_type":"secretary-general"}],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"165db8d1-c65b-55cb-9fee-99271ae40452","position":25,"note_ids":[],"note_references":[],"text":"Also requests the Secretary-General to avoid any potential duplication between the strategic heritage plan and the alteration, improvement and major maintenance of the United Nations Office at Geneva under section 33 of the regular budget;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"19.","links":[],"textWithHighlights":"Also *requests* <<the Secretary-General>> to avoid any potential duplication between the strategic heritage plan and the alteration, improvement and major maintenance of the United Nations Office at Geneva under section 33 of the regular budget;","mandates":[{"action_verb":"requests","action_verb_normalized":"request","action_verb_type":"directive","assignees":[{"assignee":"the Secretary-General","assignee_normalized":"Secretary-General","assignee_type":"secretary-general"}],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"14bef898-02f9-52c7-ba06-14966553d1e8","position":26,"note_ids":[],"note_references":[],"text":"Appreciates the existing voluntary contributions received from Member States to finance the strategic heritage plan, and requests the Secretary-General to remain proactive in seeking both voluntary and in-kind contributions from Member States, as well as donations by private entities, in full compliance with all relevant rules and regulations of the Organization and agreements related to donations for the strategic heritage plan, and to provide detailed information on this matter in the context of his next progress report;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"20.","links":[],"textWithHighlights":"*Appreciates* the existing voluntary contributions received from Member States to finance the strategic heritage plan, and requests the Secretary-General to remain proactive in seeking both voluntary and in-kind contributions from Member States, as well as donations by private entities, in full compliance with all relevant rules and regulations of the Organization and agreements related to donations for the strategic heritage plan, and to provide detailed information on this matter in the context of his next progress report;","mandates":[{"action_verb":"Appreciates","action_verb_normalized":"appreciate","action_verb_type":"evaluative","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"622de221-8ea6-5661-bd46-09e2a426fc7c","position":27,"note_ids":[],"note_references":[],"text":"Requests the Secretary-General to make all possible efforts to mobilize further voluntary contributions, aiming for at least 24 million Swiss francs to help to offset the total cost of the renovation of building B and conference rooms in building E, in full compliance with all relevant rules and regulations of the Organization and agreements related to donations, and notes that the appropriations for Member States under section 33 will be reduced according to voluntary contributions received;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"21.","links":[],"textWithHighlights":"*Requests* <<the Secretary-General>> to make all possible efforts to mobilize further voluntary contributions, aiming for at least 24 million Swiss francs to help to offset the total cost of the renovation of building B and conference rooms in building E, in full compliance with all relevant rules and regulations of the Organization and agreements related to donations, and notes that the appropriations for Member States under section 33 will be reduced according to voluntary contributions received;","mandates":[{"action_verb":"Requests","action_verb_normalized":"request","action_verb_type":"directive","assignees":[{"assignee":"the Secretary-General","assignee_normalized":"Secretary-General","assignee_type":"secretary-general"}],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"91505c1b-ba7e-5d47-9fb1-7872048daab0","position":28,"note_ids":[],"note_references":[],"text":"Also requests the Secretary-General to provide more information on the use of conference space at the United Nations Office at Geneva by non-governmental organizations in the context of his next progress report on the strategic heritage plan at the main part of its eightieth session;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"22.","links":[],"textWithHighlights":"Also *requests* <<the Secretary-General>> to provide more information on the use of conference space at the United Nations Office at Geneva by non-governmental organizations in the context of his next progress report on the strategic heritage plan at the main part of its eightieth session;","mandates":[{"action_verb":"requests","action_verb_normalized":"request","action_verb_type":"directive","assignees":[{"assignee":"the Secretary-General","assignee_normalized":"Secretary-General","assignee_type":"secretary-general"}],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"9feb696a-1b8b-5d90-a5c9-64188c880eeb","position":29,"note_ids":[],"note_references":[],"text":"Further requests the Secretary-General to ensure that remaining recommendations of the Board of Auditors are implemented fully and expeditiously;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"23.","links":[],"textWithHighlights":"Further *requests* <<the Secretary-General>> to ensure that remaining recommendations of the Board of Auditors are implemented fully and expeditiously;","mandates":[{"action_verb":"requests","action_verb_normalized":"request","action_verb_type":"directive","assignees":[{"assignee":"the Secretary-General","assignee_normalized":"Secretary-General","assignee_type":"secretary-general"}],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"6e8eaab3-417b-56fb-942c-84290ff21aaa","position":30,"note_ids":[],"note_references":[],"text":"Requests the Secretary-General to continue documenting best practices and lessons learned from capital construction projects, including value engineering, multistage request for proposals and the use of local materials and knowledge, and to consider their application, as appropriate, to ensure that the objectives of the projects are achieved within the approved budget and timeline.","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"24.","links":[],"textWithHighlights":"*Requests* <<the Secretary-General>> to continue documenting best practices and lessons learned from capital construction projects, including value engineering, multistage request for proposals and the use of local materials and knowledge, and to consider their application, as appropriate, to ensure that the objectives of the projects are achieved within the approved budget and timeline.","mandates":[{"action_verb":"Requests","action_verb_normalized":"request","action_verb_type":"directive","assignees":[{"assignee":"the Secretary-General","assignee_normalized":"Secretary-General","assignee_type":"secretary-general"}],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"c69d670c-54c7-5a69-a147-3711204744e1","position":31,"note_ids":[],"note_references":[],"text":"81st plenary meeting","type":"signature","heading_level":null,"paragraph_type":null,"paragraph_level":null,"prefix":null,"links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"8932af04-ac3d-5609-a270-40bb84c6facc","position":32,"note_ids":[],"note_references":[],"text":"30 June 2025","type":"signature","heading_level":null,"paragraph_type":null,"paragraph_level":null,"prefix":null,"links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"3e4c6e90-29b3-5d11-8178-805fd77ba5ba","position":33,"note_ids":[1],"note_references":[],"text":"A/79/352/Add.1.","type":"footnote","heading_level":null,"paragraph_type":null,"paragraph_level":null,"prefix":null,"links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"eba68a94-9322-5a01-a303-5571a781428d","position":34,"note_ids":[2],"note_references":[],"text":"A/79/7/Add.49.","type":"footnote","heading_level":null,"paragraph_type":null,"paragraph_level":null,"prefix":null,"links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"}]},"versionHistory":null,"reports":{"status":"included","data":{"source":"union","data":{"pageOneAccepted":true,"reports":[{"report_recid":4092344,"symbols":["A/80/435"],"title":"Twelfth annual progress report on the Strategic Heritage Plan of the United Nations Office at Geneva report of the Secretary-General","date_published":"2025-10-08","provenance":"page_one","catalogueAnnexOnly":null,"resolutionLinks":[{"symbol":"A/RES/79/297","provenance":"page_one","catalogueAnnexOnly":null}]}]}}},"relatedDocuments":{"status":"not_included"}}}}