{"apiVersion":"1.0.0","budgetVersion":{"slug":"ppb2027","display_name":"Proposed UN Programme Budget for 2027, Peacekeeping Budget for 2026/2027 and Plan Outline 2026-2028","ppb_year":2027,"is_default":true,"sort_order":0},"coverage":["Budget citations describe recorded programme-budget references, not legal in-force status.","Missing extracted text does not establish that the original document contains no relevant provisions.","Resolution collections are related documents, not necessarily ordered versions or legal replacements.","Citation context is the selected budget cycle. Extraction and relationship coverage may be incomplete."],"document":{"symbol":"A/RES/73/288","title":"Construction of a New Facility for the International Residual Mechanism for Criminal Tribunals, Arusha Branch","issuingBody":"GA","year":2019,"documentType":"Resolutions","subjects":["International Criminal Courts","Conference Facilities","Construction","Arusha (United Republic of Tanzania)","United Republic of Tanzania"],"agendaItems":{"numbers":["148"],"titles":["Financing of the International Residual Mechanism for Criminal Tribunals."]},"sourceUrl":"https://documents.un.org/api/symbol/access?s=A%2FRES%2F73%2F288&l=en&t=pdf","pageUrl":"https://mandates.un.org/mandate/A/RES/73/288?ppb_version=ppb2027","canonicalUrl":"https://mandates.un.org/mandate/A/RES/73/288","jsonUrl":"https://mandates.un.org/mandate/A/RES/73/288.json?ppb_version=ppb2027","budgetVersion":"ppb2027","matchingCitationCount":0,"matchingEntityCount":0,"matchingEntities":[],"matchingFoundationalEntities":[],"matchingProgrammes":[],"matchingBudgetLocations":[],"series":{"is_collection":false,"has_newer":true,"is_latest":false,"series_count":7,"latest_version":"A/RES/74/272"},"group":null,"details":{"status":"included","citations":[],"budgetLocations":[],"foundationalEntities":[],"budgetLocationExpenditures":[],"entityCitationTotals":{},"entityExpenditures":{},"paragraphs":{"status":"available","language":"en","items":[{"extraction_quality_warning":false,"id":"9c723d01-678d-5527-bc64-7bb8e8a18fc1","position":0,"note_ids":[],"note_references":[],"text":"Seventy-third session","type":"frontmatter","heading_level":null,"paragraph_type":null,"paragraph_level":null,"prefix":null,"links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"82c5f5b9-8c51-5900-ae51-f5f6c0780ec6","position":1,"note_ids":[],"note_references":[],"text":"Agenda item 148","type":"frontmatter","heading_level":null,"paragraph_type":null,"paragraph_level":null,"prefix":null,"links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"b5bedb00-2705-5f8f-b083-1ccae42c8dff","position":2,"note_ids":[],"note_references":[],"text":"Resolution adopted by the General Assembly on 15 April 2019","type":"frontmatter","heading_level":null,"paragraph_type":null,"paragraph_level":null,"prefix":null,"links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"12f16316-e3b6-5ac7-a6f0-f2013d4502e9","position":3,"note_ids":[],"note_references":[],"text":"[on the report of the Fifth Committee (A/73/670/Add.1)]","type":"frontmatter","heading_level":null,"paragraph_type":null,"paragraph_level":null,"prefix":null,"links":[["A/73/670/Add.1","https://undocs.org/A/73/670/Add.1"]],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"7acb59ee-d1b7-5496-abd1-8aa6adefeca8","position":4,"note_ids":[],"note_references":[],"text":"Construction of a new facility for the International Residual Mechanism for Criminal Tribunals, Arusha branch","type":"title","heading_level":null,"paragraph_type":null,"paragraph_level":null,"prefix":"73/288.","links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"982e4c35-a18c-5ec1-abfb-f77901878797","position":5,"note_ids":[],"note_references":[],"text":"The General Assembly,","type":"opening","heading_level":null,"paragraph_type":"preambular","paragraph_level":0,"prefix":null,"links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"ee108e61-8b23-5394-b313-205edf4522a3","position":6,"note_ids":[],"note_references":[],"text":"Recalling its resolutions 66/240 A of 24 December 2011, 66/240 B of 21 June 2012, 67/244 A of 24 December 2012, 67/244 B of 12 April 2013, 68/257 of 27 December 2013, 68/267 of 9 April 2014, 69/256 of 29 December 2014, 69/276 of 2 April 2015, 70/243 of 23 December 2015, 70/258 of 1 April 2016, 71/282 of 6 April 2017 and 72/270 of 4 April 2018,","type":"paragraph","heading_level":null,"paragraph_type":"preambular","paragraph_level":1,"prefix":null,"links":[["66/240","https://undocs.org/en/A/RES/66/240"],["66/240 B","https://undocs.org/en/A/RES/66/240b"],["67/244","https://undocs.org/en/A/RES/67/244"],["67/244 B","https://undocs.org/en/A/RES/66/240b"],["68/257","https://undocs.org/en/A/RES/68/257"],["68/267","https://undocs.org/en/A/RES/68/267"],["69/256","https://undocs.org/en/A/RES/69/256"],["69/276","https://undocs.org/en/A/RES/69/276"],["70/243","https://undocs.org/en/A/RES/70/243"],["70/258","https://undocs.org/en/A/RES/70/258"],["71/282","https://undocs.org/en/A/RES/71/282"],["72/270","https://undocs.org/en/A/RES/72/270"]],"textWithHighlights":"*Recalling* its resolutions 66/240 A of 24 December 2011, 66/240 B of 21 June 2012, 67/244 A of 24 December 2012, 67/244 B of 12 April 2013, 68/257 of 27 December 2013, 68/267 of 9 April 2014, 69/256 of 29 December 2014, 69/276 of 2 April 2015, 70/243 of 23 December 2015, 70/258 of 1 April 2016, 71/282 of 6 April 2017 and 72/270 of 4 April 2018,","mandates":[{"action_verb":"Recalling","action_verb_normalized":"recall","action_verb_type":"reinforcing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"f77da895-e331-5cf5-9a23-ad1c6c00c3f8","position":7,"note_ids":[1,2],"note_references":[{"offset":53,"note_id":1},{"offset":145,"note_id":2}],"text":"Having considered the report of the Secretary-General and the related report of the Advisory Committee on Administrative and Budgetary Questions,","type":"paragraph","heading_level":null,"paragraph_type":"preambular","paragraph_level":1,"prefix":null,"links":[],"textWithHighlights":"*Having considered* the report of the Secretary-General and the related report of the Advisory Committee on Administrative and Budgetary Questions,","mandates":[{"action_verb":"Having considered","action_verb_normalized":"consider","action_verb_type":"observing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"44909d43-3ee2-5105-b292-ce3f1007dcee","position":8,"note_ids":[],"note_references":[],"text":"Takes note of the report of the Secretary-General;1","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"1.","links":[],"textWithHighlights":"*Takes note* of the report of the Secretary-General;1","mandates":[{"action_verb":"Takes note","action_verb_normalized":"take note","action_verb_type":"observing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"f60a2fee-cceb-5c21-ad74-0572d00cd8a7","position":9,"note_ids":[],"note_references":[],"text":"Endorses the conclusions and recommendations contained in the report of the Advisory Committee on Administrative and Budgetary Questions;2","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"2.","links":[],"textWithHighlights":"*Endorses* the conclusions and recommendations contained in the report of the Advisory Committee on Administrative and Budgetary Questions;2","mandates":[{"action_verb":"Endorses","action_verb_normalized":"endorse","action_verb_type":"deciding","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"353b4516-9b10-5ed7-9a14-4a7c32cb2454","position":10,"note_ids":[],"note_references":[],"text":"Notes with appreciation the continued efforts of the Government of the United Republic of Tanzania in facilitating the construction project;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"3.","links":[],"textWithHighlights":"*Notes* with appreciation the continued efforts of the Government of the United Republic of Tanzania in facilitating the construction project;","mandates":[{"action_verb":"Notes","action_verb_normalized":"note","action_verb_type":"observing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"ae974a68-1dac-569d-8cd3-177bd10b29dd","position":11,"note_ids":[],"note_references":[],"text":"Stresses the importance of completing all outstanding works on time and within budget, and to that end requests the Secretary-General to complete the construction, including the remediation of defects relating to the heating, ventilation and air-conditioning system, within the revised time frame and within the total budget of 8,787,733 United States dollars approved for the project;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"4.","links":[],"textWithHighlights":"*Stresses* the importance of completing all outstanding works on time and within budget, and to that end requests the Secretary-General to complete the construction, including the remediation of defects relating to the heating, ventilation and air-conditioning system, within the revised time frame and within the total budget of 8,787,733 United States dollars approved for the project;","mandates":[{"action_verb":"Stresses","action_verb_normalized":"stress","action_verb_type":"reinforcing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"fa6b9dfa-8b66-5e01-98bb-7cf64ac20870","position":12,"note_ids":[],"note_references":[],"text":"Recalls paragraph 28 of the report of the Advisory Committee, and requests the Secretary-General to continue his efforts to pursue the recovery of the direct and indirect costs arising from errors and delays, where economically feasible to do so, and to report thereon in the context of his final report;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"5.","links":[],"textWithHighlights":"*Recalls* paragraph 28 of the report of the Advisory Committee, and requests the Secretary-General to continue his efforts to pursue the recovery of the direct and indirect costs arising from errors and delays, where economically feasible to do so, and to report thereon in the context of his final report;","mandates":[{"action_verb":"Recalls","action_verb_normalized":"recall","action_verb_type":"reinforcing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"7ab9b502-2b25-5a0a-a8a3-197e05976d34","position":13,"note_ids":[],"note_references":[],"text":"Notes the progress made in the construction of the new premises, and requests the Secretary-General to submit a final report to the General Assembly during its seventy-fourth session;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"6.","links":[],"textWithHighlights":"*Notes* the progress made in the construction of the new premises, and requests the Secretary-General to submit a final report to the General Assembly during its seventy-fourth session;","mandates":[{"action_verb":"Notes","action_verb_normalized":"note","action_verb_type":"observing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"888d7873-fa18-5508-a334-d33d07e319b1","position":14,"note_ids":[],"note_references":[],"text":"Requests the Secretary-General, in the context of his final report, to include, inter alia, an analysis of and comprehensive information on lessons learned and best practices for application, as appropriate, to other construction projects;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"7.","links":[],"textWithHighlights":"*Requests* <<the Secretary-General, in the context of his final report>>, to include, inter alia, an analysis of and comprehensive information on lessons learned and best practices for application, as appropriate, to other construction projects;","mandates":[{"action_verb":"Requests","action_verb_normalized":"request","action_verb_type":"directive","assignees":[{"assignee":"the Secretary-General, in the context of his final report","assignee_normalized":"Secretary-General","assignee_type":"secretary-general"}],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"6c805231-4de7-58ef-99b2-aa28b6851d14","position":15,"note_ids":[],"note_references":[],"text":"Welcomes the efforts made by the International Residual Mechanism for Criminal Tribunals to cooperate with other United Nations entities on construction-related issues.","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"8.","links":[],"textWithHighlights":"*Welcomes* the efforts made by the International Residual Mechanism for Criminal Tribunals to cooperate with other United Nations entities on construction-related issues.","mandates":[{"action_verb":"Welcomes","action_verb_normalized":"welcome","action_verb_type":"evaluative","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"1b52d69f-aa5b-5271-9303-1b462899dbbf","position":16,"note_ids":[],"note_references":[],"text":"75th plenary meeting 15 April 2019","type":"signature","heading_level":null,"paragraph_type":null,"paragraph_level":null,"prefix":null,"links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"0d59028e-748e-531a-b346-7b43c328e880","position":17,"note_ids":[1],"note_references":[],"text":"A/73/718.","type":"footnote","heading_level":null,"paragraph_type":null,"paragraph_level":null,"prefix":null,"links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"39521f78-62ac-550a-9362-3f2ea4f64a41","position":18,"note_ids":[2],"note_references":[],"text":"A/73/763.","type":"footnote","heading_level":null,"paragraph_type":null,"paragraph_level":null,"prefix":null,"links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"}]},"versionHistory":{"series_count":7,"first_year":2014,"last_year":2020,"is_collection":false,"has_newer":true,"is_latest":false,"members":[{"document_symbol":"A/RES/74/272","text_metrics":{"comparison_unavailable_reason":"ordered","word_count":456,"previous_document_symbol":"A/RES/73/288","can_compare":true,"similarity_to_previous":0.4364035087719298},"title":"Construction of a new facility for the International Residual Mechanism for Criminal Tribunals, Arusha branch","year":2020,"is_latest":true},{"document_symbol":"A/RES/73/288","text_metrics":{"comparison_unavailable_reason":"ordered","word_count":367,"previous_document_symbol":"A/RES/72/270","can_compare":true,"similarity_to_previous":0.38147138964577654},"title":"Construction of a new facility for the International Residual Mechanism for Criminal Tribunals, Arusha branch","year":2019,"is_latest":false},{"document_symbol":"A/RES/72/270","text_metrics":{"comparison_unavailable_reason":"ordered","word_count":142,"previous_document_symbol":"A/RES/71/282","can_compare":true,"similarity_to_previous":0.9436619718309859},"title":"Construction of a new facility for the International Residual Mechanism for Criminal Tribunals, Arusha branch","year":2018,"is_latest":false},{"document_symbol":"A/RES/71/282","text_metrics":{"comparison_unavailable_reason":"ordered","word_count":136,"previous_document_symbol":"A/RES/70/258","can_compare":true,"similarity_to_previous":0.36858006042296076},"title":"Construction of a new facility for the International Residual Mechanism for Criminal Tribunals, Arusha branch","year":2017,"is_latest":false},{"document_symbol":"A/RES/70/258","text_metrics":{"comparison_unavailable_reason":"ordered","word_count":331,"previous_document_symbol":"A/RES/69/276","can_compare":true,"similarity_to_previous":0.32125205930807244},"title":"Construction of a new facility for the International Residual Mechanism for Criminal Tribunals, Arusha branch","year":2016,"is_latest":false},{"document_symbol":"A/RES/69/276","text_metrics":{"comparison_unavailable_reason":"ordered","word_count":607,"previous_document_symbol":"A/RES/68/267","can_compare":true,"similarity_to_previous":0.4052718286655683},"title":"Construction of a new facility for the International Residual Mechanism for Criminal Tribunals, Arusha branch","year":2015,"is_latest":false},{"document_symbol":"A/RES/68/267","text_metrics":{"comparison_unavailable_reason":"first","word_count":511,"previous_document_symbol":null,"can_compare":false,"similarity_to_previous":null},"title":"Construction of a new facility for the International Residual Mechanism for Criminal Tribunals, Arusha branch","year":2014,"is_latest":false}],"latest_version":"A/RES/74/272"},"reports":{"status":"included","data":{"source":"union","data":{"pageOneAccepted":true,"reports":[{"report_recid":3850008,"symbols":["A/74/662"],"title":"Construction of a new facility for the International Residual Mechanism for Criminal Tribunals, Arusha branch report of the Secretary-General","date_published":"2020-01-21","provenance":"catalogue_notes","catalogueAnnexOnly":false,"resolutionLinks":[{"symbol":"A/RES/73/288","provenance":"catalogue_notes","catalogueAnnexOnly":false}]},{"report_recid":1663210,"symbols":["A/73/718"],"title":"Construction of a new facility for the International Residual Mechanism for Criminal Tribunals, Arusha branch report of the Secretary-General","date_published":"2019-01-22","provenance":"catalogue_notes","catalogueAnnexOnly":false,"resolutionLinks":[{"symbol":"A/RES/72/270","provenance":"catalogue_notes","catalogueAnnexOnly":false}]},{"report_recid":1472014,"symbols":["A/72/734"],"title":"Construction of a new facility for the International Residual Mechanism for Criminal Tribunals, Arusha branch report of the Secretary-General","date_published":"2018-02-06","provenance":"catalogue_notes","catalogueAnnexOnly":false,"resolutionLinks":[{"symbol":"A/RES/71/282","provenance":"catalogue_notes","catalogueAnnexOnly":false}]},{"report_recid":858146,"symbols":["A/71/753"],"title":"Construction of a new facility for the International Residual Mechanism for Criminal Tribunals, Arusha branch report of the Secretary-General","date_published":"2017-01-19","provenance":"catalogue_notes","catalogueAnnexOnly":false,"resolutionLinks":[{"symbol":"A/RES/70/258","provenance":"catalogue_notes","catalogueAnnexOnly":false}]}]}}},"relatedDocuments":{"status":"not_included"}}}}