{"apiVersion":"1.0.0","budgetVersion":{"slug":"ppb2027","display_name":"Proposed UN Programme Budget for 2027, Peacekeeping Budget for 2026/2027 and Plan Outline 2026-2028","ppb_year":2027,"is_default":true,"sort_order":0},"coverage":["Budget citations describe recorded programme-budget references, not legal in-force status.","Missing extracted text does not establish that the original document contains no relevant provisions.","Resolution collections are related documents, not necessarily ordered versions or legal replacements.","Citation context is the selected budget cycle. Extraction and relationship coverage may be incomplete."],"document":{"symbol":"A/RES/69/276","title":"Construction of a New Facility for the International Residual Mechanism for Criminal Tribunals, Arusha Branch","issuingBody":"GA","year":2015,"documentType":"Resolutions","subjects":["Construction","Risk Management","Purchasing","Environmental Impact Assessment","Furniture","Equipment and Supplies","United Republic of Tanzania"],"agendaItems":{"numbers":["147"],"titles":["Financing of the International Residual Mechanism for Criminal Tribunals."]},"sourceUrl":"https://documents.un.org/api/symbol/access?s=A%2FRES%2F69%2F276&l=en&t=pdf","pageUrl":"https://mandates.un.org/mandate/A/RES/69/276?ppb_version=ppb2027","canonicalUrl":"https://mandates.un.org/mandate/A/RES/69/276","jsonUrl":"https://mandates.un.org/mandate/A/RES/69/276.json?ppb_version=ppb2027","budgetVersion":"ppb2027","matchingCitationCount":0,"matchingEntityCount":0,"matchingEntities":[],"matchingFoundationalEntities":[],"matchingProgrammes":[],"matchingBudgetLocations":[],"series":{"is_collection":false,"has_newer":true,"is_latest":false,"series_count":7,"latest_version":"A/RES/74/272"},"group":null,"details":{"status":"included","citations":[],"budgetLocations":[],"foundationalEntities":[],"budgetLocationExpenditures":[],"entityCitationTotals":{},"entityExpenditures":{},"paragraphs":{"status":"available","language":"en","items":[{"extraction_quality_warning":false,"id":"f6a849ab-d805-5f45-bfb4-97b17e62ac82","position":0,"note_ids":[],"note_references":[],"text":"Resolution adopted by the General Assembly on 2 April 2015","type":"frontmatter","heading_level":null,"paragraph_type":null,"paragraph_level":null,"prefix":null,"links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"96b0b2ea-9a5a-5869-b2f2-06f87e196498","position":1,"note_ids":[],"note_references":[],"text":"[on the report of the Fifth Committee (A/69/693/Add.1)]","type":"frontmatter","heading_level":null,"paragraph_type":null,"paragraph_level":null,"prefix":null,"links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"0eced906-8ff5-548f-a502-311302ddf79c","position":2,"note_ids":[],"note_references":[],"text":"Construction of a new facility for the International Residual Mechanism for Criminal Tribunals, Arusha branch","type":"title","heading_level":null,"paragraph_type":null,"paragraph_level":null,"prefix":"69/276.","links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"b454fc02-1d9e-5e0b-9586-3e830031e60e","position":3,"note_ids":[],"note_references":[],"text":"The General Assembly,","type":"opening","heading_level":null,"paragraph_type":"preambular","paragraph_level":0,"prefix":null,"links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"1fc7d6f1-30e4-5912-a6fc-30e47fbb4e12","position":4,"note_ids":[],"note_references":[],"text":"Recalling its resolutions 66/240 B of 21 June 2012, 67/244 A of 24 December 2012, 67/244 B of 12 April 2013, 68/257 of 27 December 2013 and 68/267 of 9 April 2014,","type":"paragraph","heading_level":null,"paragraph_type":"preambular","paragraph_level":1,"prefix":null,"links":[],"textWithHighlights":"*Recalling* its resolutions 66/240 B of 21 June 2012, 67/244 A of 24 December 2012, 67/244 B of 12 April 2013, 68/257 of 27 December 2013 and 68/267 of 9 April 2014,","mandates":[{"action_verb":"Recalling","action_verb_normalized":"recall","action_verb_type":"reinforcing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"15b1d3de-6b1c-54d3-837a-0f449626abe2","position":5,"note_ids":[2,3],"note_references":[{"offset":53,"note_id":2},{"offset":145,"note_id":3}],"text":"Having considered the report of the Secretary-General and the related report of the Advisory Committee on Administrative and Budgetary Questions,","type":"paragraph","heading_level":null,"paragraph_type":"preambular","paragraph_level":1,"prefix":null,"links":[],"textWithHighlights":"*Having considered* the report of the Secretary-General and the related report of the Advisory Committee on Administrative and Budgetary Questions,","mandates":[{"action_verb":"Having considered","action_verb_normalized":"consider","action_verb_type":"observing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"3b56b33a-8d60-5b50-8fcc-b752c0ae1347","position":6,"note_ids":[],"note_references":[],"text":"Reiterates its appreciation for the continued support of the Government of the United Republic of Tanzania in facilitating the construction of the new facility;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"1.","links":[],"textWithHighlights":"*Reiterates* its appreciation for the continued support of the Government of the United Republic of Tanzania in facilitating the construction of the new facility;","mandates":[{"action_verb":"Reiterates","action_verb_normalized":"reiterate","action_verb_type":"reinforcing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"c29c2016-8347-508d-bed2-d05580d6100d","position":7,"note_ids":[],"note_references":[],"text":"Takes note of the report of the Secretary-General;Error: Reference source not found","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"2.","links":[],"textWithHighlights":"*Takes note* of the report of the Secretary-General;Error: Reference source not found","mandates":[{"action_verb":"Takes note","action_verb_normalized":"take note","action_verb_type":"observing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"06c94814-ba33-5d33-94ec-10ae19c2f903","position":8,"note_ids":[],"note_references":[],"text":"Endorses the conclusions and recommendations contained in the report of the Advisory Committee on Administrative and Budgetary Questions,Error: Reference source not found subject to the provisions of the present resolution;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"3.","links":[],"textWithHighlights":"*Endorses* the conclusions and recommendations contained in the report of the Advisory Committee on Administrative and Budgetary Questions,Error: Reference source not found subject to the provisions of the present resolution;","mandates":[{"action_verb":"Endorses","action_verb_normalized":"endorse","action_verb_type":"deciding","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"05a1a02d-264f-5ac4-89a3-2a119a62d403","position":9,"note_ids":[],"note_references":[],"text":"Welcomes the continued efforts made by the International Residual Mechanism for Criminal Tribunals to seek cooperation with other judicial institutions;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"4.","links":[],"textWithHighlights":"*Welcomes* the continued efforts made by the International Residual Mechanism for Criminal Tribunals to seek cooperation with other judicial institutions;","mandates":[{"action_verb":"Welcomes","action_verb_normalized":"welcome","action_verb_type":"evaluative","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"ae807e88-d932-59ed-aa38-c0ddac58e48e","position":10,"note_ids":[],"note_references":[],"text":"Encourages the Secretary-General to continue his efforts to include local knowledge and capacity in the implementation of the project;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"5.","links":[],"textWithHighlights":"*Encourages* <<the Secretary-General>> to continue his efforts to include local knowledge and capacity in the implementation of the project;","mandates":[{"action_verb":"Encourages","action_verb_normalized":"encourage","action_verb_type":"directive","assignees":[{"assignee":"the Secretary-General","assignee_normalized":"Secretary-General","assignee_type":"secretary-general"}],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"44a1a028-5066-54f3-96b3-6a251c8e4ac9","position":11,"note_ids":[],"note_references":[],"text":"Notes that office accommodation will be adjustable for various staffing requirements, including through the use of shared areas within the facility without increasing its overall size, and in this regard requests the Secretary-General to continue to provide information on this matter in the context of future progress reports;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"6.","links":[],"textWithHighlights":"*Notes* that office accommodation will be adjustable for various staffing requirements, including through the use of shared areas within the facility without increasing its overall size, and in this regard requests the Secretary-General to continue to provide information on this matter in the context of future progress reports;","mandates":[{"action_verb":"Notes","action_verb_normalized":"note","action_verb_type":"observing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"e7db7729-4d33-5c14-b152-430259bba57f","position":12,"note_ids":[],"note_references":[],"text":"Encourages the Secretary-General to ensure that lessons learned and best practices are shared and applied to ongoing and future capital projects, as appropriate;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"7.","links":[],"textWithHighlights":"*Encourages* <<the Secretary-General>> to ensure that lessons learned and best practices are shared and applied to ongoing and future capital projects, as appropriate;","mandates":[{"action_verb":"Encourages","action_verb_normalized":"encourage","action_verb_type":"directive","assignees":[{"assignee":"the Secretary-General","assignee_normalized":"Secretary-General","assignee_type":"secretary-general"}],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"61cde79d-d895-54ee-bc52-d1d5852a2cc7","position":13,"note_ids":[],"note_references":[],"text":"Requests the Secretary-General to continue to take all measures necessary to mitigate potential risks and to ensure that the construction project is monitored closely and is completed within the approved timeline and resources;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"8.","links":[],"textWithHighlights":"*Requests* <<the Secretary-General>> to continue to take all measures necessary to mitigate potential risks and to ensure that the construction project is monitored closely and is completed within the approved timeline and resources;","mandates":[{"action_verb":"Requests","action_verb_normalized":"request","action_verb_type":"directive","assignees":[{"assignee":"the Secretary-General","assignee_normalized":"Secretary-General","assignee_type":"secretary-general"}],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"7ccb8505-f8f4-5a25-a77e-a63382d07a04","position":14,"note_ids":[],"note_references":[],"text":"Emphasizes that contingency provisions approved for construction projects serve to provide necessary safeguards against unforeseen cost overruns during project implementation, and in this regard requests the Secretary-General to ensure that, in the future, any cost overruns are first met from compensatory reductions identified elsewhere through efficiencies in order to obviate to the extent possible the need for drawdown from contingency provisions;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"9.","links":[],"textWithHighlights":"*Emphasizes* that contingency provisions approved for construction projects serve to provide necessary safeguards against unforeseen cost overruns during project implementation, and in this regard requests the Secretary-General to ensure that, in the future, any cost overruns are first met from compensatory reductions identified elsewhere through efficiencies in order to obviate to the extent possible the need for drawdown from contingency provisions;","mandates":[{"action_verb":"Emphasizes","action_verb_normalized":"emphasize","action_verb_type":"reinforcing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"2265d277-9b6c-5846-82dc-07cc1177cabf","position":15,"note_ids":[],"note_references":[],"text":"Notes with concern the higher-than-budgeted amount awarded for the architectural and engineering consultancy services as well as the construction contracts, and in this regard requests the Secretary-General to make every effort to seek efficiencies throughout the implementation of the project and to report thereon in the context of future progress reports;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"10.","links":[],"textWithHighlights":"*Notes* with concern the higher-than-budgeted amount awarded for the architectural and engineering consultancy services as well as the construction contracts, and in this regard requests the Secretary-General to make every effort to seek efficiencies throughout the implementation of the project and to report thereon in the context of future progress reports;","mandates":[{"action_verb":"Notes","action_verb_normalized":"note","action_verb_type":"observing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"38d4def2-f110-55ac-8c1f-e04f57f14708","position":16,"note_ids":[],"note_references":[],"text":"Recalls paragraphs 31 and 32 of the report of the Advisory Committee, and in this regard encourages the Secretary-General to continue to explore the possibilities for utilizing usable furniture and equipment from the International Criminal Tribunal for the Prosecution of Persons Responsible for Genocide and Other Serious Violations of International Humanitarian Law Committed in the Territory of Rwanda and Rwandan Citizens Responsible for Genocide and Other Such Violations Committed in the Territory of Neighbouring States between 1 January and 31 December 1994 and the International Tribunal for the Prosecution of Persons Responsible for Serious Violations of International Humanitarian Law Committed in the Territory of the Former Yugoslavia since 1991 in the Mechanism, where possible and economical, and to report thereon in the context of future progress reports;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"11.","links":[],"textWithHighlights":"*Recalls* paragraphs 31 and 32 of the report of the Advisory Committee, and in this regard encourages the Secretary-General to continue to explore the possibilities for utilizing usable furniture and equipment from the International Criminal Tribunal for the Prosecution of Persons Responsible for Genocide and Other Serious Violations of International Humanitarian Law Committed in the Territory of Rwanda and Rwandan Citizens Responsible for Genocide and Other Such Violations Committed in the Territory of Neighbouring States between 1 January and 31 December 1994 and the International Tribunal for the Prosecution of Persons Responsible for Serious Violations of International Humanitarian Law Committed in the Territory of the Former Yugoslavia since 1991 in the Mechanism, where possible and economical, and to report thereon in the context of future progress reports;","mandates":[{"action_verb":"Recalls","action_verb_normalized":"recall","action_verb_type":"reinforcing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"aca7363c-a62c-5ffa-bec5-0db2acbc37fa","position":17,"note_ids":[],"note_references":[],"text":"Requests the Secretary-General to continue to update Member States regularly, through the Office of Central Support Services of the Department of Management of the Secretariat, on the progress of the construction project;","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"12.","links":[],"textWithHighlights":"*Requests* <<the Secretary-General>> to continue to update Member States regularly, through the Office of Central Support Services of the Department of Management of the Secretariat, on the progress of the construction project;","mandates":[{"action_verb":"Requests","action_verb_normalized":"request","action_verb_type":"directive","assignees":[{"assignee":"the Secretary-General","assignee_normalized":"Secretary-General","assignee_type":"secretary-general"}],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"afa69d74-9f91-5f32-be24-8325bf43df3c","position":18,"note_ids":[],"note_references":[],"text":"Also requests the Secretary-General to submit to the General Assembly, at the first part of its resumed seventieth session, a progress report on the implementation of the project, outlining, inter alia, the project expenditures and total costs.","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"13.","links":[],"textWithHighlights":"Also *requests* <<the Secretary-General>> to submit to the General Assembly, at the first part of its resumed seventieth session, a progress report on the implementation of the project, outlining, inter alia, the project expenditures and total costs.","mandates":[{"action_verb":"requests","action_verb_normalized":"request","action_verb_type":"directive","assignees":[{"assignee":"the Secretary-General","assignee_normalized":"Secretary-General","assignee_type":"secretary-general"}],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"3ec2d530-ba1a-5fb6-9533-669dd1048cdc","position":19,"note_ids":[],"note_references":[],"text":"84th plenary meeting 2 April 2015","type":"signature","heading_level":null,"paragraph_type":null,"paragraph_level":null,"prefix":null,"links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"b7a4b31f-9328-583f-886a-ce5bab3fadf3","position":20,"note_ids":[2],"note_references":[],"text":"A/69/734.","type":"footnote","heading_level":null,"paragraph_type":null,"paragraph_level":null,"prefix":null,"links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"28ff6e07-ad55-5750-9916-b82b6b4ec8a6","position":21,"note_ids":[3],"note_references":[],"text":"A/69/788.","type":"footnote","heading_level":null,"paragraph_type":null,"paragraph_level":null,"prefix":null,"links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"}]},"versionHistory":{"series_count":7,"first_year":2014,"last_year":2020,"is_collection":false,"has_newer":true,"is_latest":false,"members":[{"document_symbol":"A/RES/74/272","text_metrics":{"comparison_unavailable_reason":"ordered","word_count":456,"previous_document_symbol":"A/RES/73/288","can_compare":true,"similarity_to_previous":0.4364035087719298},"title":"Construction of a new facility for the International Residual Mechanism for Criminal Tribunals, Arusha branch","year":2020,"is_latest":true},{"document_symbol":"A/RES/73/288","text_metrics":{"comparison_unavailable_reason":"ordered","word_count":367,"previous_document_symbol":"A/RES/72/270","can_compare":true,"similarity_to_previous":0.38147138964577654},"title":"Construction of a new facility for the International Residual Mechanism for Criminal Tribunals, Arusha branch","year":2019,"is_latest":false},{"document_symbol":"A/RES/72/270","text_metrics":{"comparison_unavailable_reason":"ordered","word_count":142,"previous_document_symbol":"A/RES/71/282","can_compare":true,"similarity_to_previous":0.9436619718309859},"title":"Construction of a new facility for the International Residual Mechanism for Criminal Tribunals, Arusha branch","year":2018,"is_latest":false},{"document_symbol":"A/RES/71/282","text_metrics":{"comparison_unavailable_reason":"ordered","word_count":136,"previous_document_symbol":"A/RES/70/258","can_compare":true,"similarity_to_previous":0.36858006042296076},"title":"Construction of a new facility for the International Residual Mechanism for Criminal Tribunals, Arusha branch","year":2017,"is_latest":false},{"document_symbol":"A/RES/70/258","text_metrics":{"comparison_unavailable_reason":"ordered","word_count":331,"previous_document_symbol":"A/RES/69/276","can_compare":true,"similarity_to_previous":0.32125205930807244},"title":"Construction of a new facility for the International Residual Mechanism for Criminal Tribunals, Arusha branch","year":2016,"is_latest":false},{"document_symbol":"A/RES/69/276","text_metrics":{"comparison_unavailable_reason":"ordered","word_count":607,"previous_document_symbol":"A/RES/68/267","can_compare":true,"similarity_to_previous":0.4052718286655683},"title":"Construction of a new facility for the International Residual Mechanism for Criminal Tribunals, Arusha branch","year":2015,"is_latest":false},{"document_symbol":"A/RES/68/267","text_metrics":{"comparison_unavailable_reason":"first","word_count":511,"previous_document_symbol":null,"can_compare":false,"similarity_to_previous":null},"title":"Construction of a new facility for the International Residual Mechanism for Criminal Tribunals, Arusha branch","year":2014,"is_latest":false}],"latest_version":"A/RES/74/272"},"reports":{"status":"included","data":{"source":"union","data":{"pageOneAccepted":true,"reports":[{"report_recid":3850008,"symbols":["A/74/662"],"title":"Construction of a new facility for the International Residual Mechanism for Criminal Tribunals, Arusha branch report of the Secretary-General","date_published":"2020-01-21","provenance":"catalogue_notes","catalogueAnnexOnly":false,"resolutionLinks":[{"symbol":"A/RES/73/288","provenance":"catalogue_notes","catalogueAnnexOnly":false}]},{"report_recid":1663210,"symbols":["A/73/718"],"title":"Construction of a new facility for the International Residual Mechanism for Criminal Tribunals, Arusha branch report of the Secretary-General","date_published":"2019-01-22","provenance":"catalogue_notes","catalogueAnnexOnly":false,"resolutionLinks":[{"symbol":"A/RES/72/270","provenance":"catalogue_notes","catalogueAnnexOnly":false}]},{"report_recid":1472014,"symbols":["A/72/734"],"title":"Construction of a new facility for the International Residual Mechanism for Criminal Tribunals, Arusha branch report of the Secretary-General","date_published":"2018-02-06","provenance":"catalogue_notes","catalogueAnnexOnly":false,"resolutionLinks":[{"symbol":"A/RES/71/282","provenance":"catalogue_notes","catalogueAnnexOnly":false}]},{"report_recid":858146,"symbols":["A/71/753"],"title":"Construction of a new facility for the International Residual Mechanism for Criminal Tribunals, Arusha branch report of the Secretary-General","date_published":"2017-01-19","provenance":"catalogue_notes","catalogueAnnexOnly":false,"resolutionLinks":[{"symbol":"A/RES/70/258","provenance":"catalogue_notes","catalogueAnnexOnly":false}]}]}}},"relatedDocuments":{"status":"not_included"}}}}