{"apiVersion":"1.0.0","budgetVersion":{"slug":"ppb2027","display_name":"Proposed UN Programme Budget for 2027, Peacekeeping Budget for 2026/2027 and Plan Outline 2026-2028","ppb_year":2027,"is_default":true,"sort_order":0},"coverage":["Budget citations describe recorded programme-budget references, not legal in-force status.","Missing extracted text does not establish that the original document contains no relevant provisions.","Resolution collections are related documents, not necessarily ordered versions or legal replacements.","Citation context is the selected budget cycle. Extraction and relationship coverage may be incomplete."],"document":{"symbol":"A/RES/32/159","title":"Implementation of the Mediun-Term and Long-Term Recovery and Rehabilitation Programme in the Sudano-Sahelian Region and Urgent Measures to Be Taken on Behalf of the Region","issuingBody":"GA","year":1978,"documentType":"Resolutions","subjects":["Drought-Stricken Areas","Emergency Relief","Food Aid","Drought Control","Sudano-Sahelian Region"],"agendaItems":{"numbers":["12"],"titles":["Report of the Economic and Social Council."]},"sourceUrl":"https://documents.un.org/api/symbol/access?s=A%2FRES%2F32%2F159&l=en&t=pdf","pageUrl":"https://mandates.un.org/mandate/A/RES/32/159?ppb_version=ppb2027","canonicalUrl":"https://mandates.un.org/mandate/A/RES/32/159","jsonUrl":"https://mandates.un.org/mandate/A/RES/32/159.json?ppb_version=ppb2027","budgetVersion":"ppb2027","matchingCitationCount":0,"matchingEntityCount":0,"matchingEntities":[],"matchingFoundationalEntities":[],"matchingProgrammes":[],"matchingBudgetLocations":[],"series":null,"group":null,"details":{"status":"included","citations":[],"budgetLocations":[],"foundationalEntities":[],"budgetLocationExpenditures":[],"entityCitationTotals":{},"entityExpenditures":{},"paragraphs":{"status":"available","language":"en","items":[{"extraction_quality_warning":false,"id":"9cee693b-d550-5aaa-ac14-3164e54494d9","position":0,"note_ids":[],"note_references":[],"text":"Implementation of the medium-term aml long• term recovery and rehahilita• tion programme in the· Sudano-Sahelian region and urgent measures to he taken on hchalf of the region","type":"title","heading_level":null,"paragraph_type":null,"paragraph_level":null,"prefix":"32/159.","links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"55de7997-f95a-5cb1-95ae-6916cb066d50","position":1,"note_ids":[],"note_references":[],"text":"The General Assembly,","type":"opening","heading_level":null,"paragraph_type":"preambular","paragraph_level":0,"prefix":null,"links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"8ac4cedd-28e5-517b-8d74-9cd881546c6f","position":2,"note_ids":[],"note_references":[],"text":"Recalling its resolutions 2816 (XXVI) of 14 December 1971. 2959 (XXVII) of 12 December 1972 and 3054 (XXVIII) of 17 October 1973,","type":"paragraph","heading_level":null,"paragraph_type":"preambular","paragraph_level":1,"prefix":null,"links":[],"textWithHighlights":"*Recalling* its resolutions 2816 (XXVI) of 14 December 1971. 2959 (XXVII) of 12 December 1972 and 3054 (XXVIII) of 17 October 1973,","mandates":[{"action_verb":"Recalling","action_verb_normalized":"recall","action_verb_type":"reinforcing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"8642f668-5121-539e-8364-5ccc395382d4","position":3,"note_ids":[],"note_references":[],"text":"Recalling further its resolutions 3253 (XXIX) of 4 December 1974. 3512 (XXX) of 15 December 1975 and 31 / 180 of 21 December 197 6 and Economic and Social Council resolutions l 918 (LVIII) of 5 May 1975 and 2103 (LXIII) of 3 August 1977,","type":"paragraph","heading_level":null,"paragraph_type":"preambular","paragraph_level":1,"prefix":null,"links":[],"textWithHighlights":"*Recalling* further its resolutions 3253 (XXIX) of 4 December 1974. 3512 (XXX) of 15 December 1975 and 31 / 180 of 21 December 197 6 and Economic and Social Council resolutions l 918 (LVIII) of 5 May 1975 and 2103 (LXIII) of 3 August 1977,","mandates":[{"action_verb":"Recalling","action_verb_normalized":"recall","action_verb_type":"reinforcing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"d77a1b60-6837-5aee-b9d0-5b23decda587","position":4,"note_ids":[],"note_references":[],"text":"Taking note of the decision of 27 June 1977 of the Governing Council of the United Nations Development Programme'~ concerning the implementation of the medium-term and long-term recovery and rehabilitation programme in the Sudano-Sahelian region,","type":"paragraph","heading_level":null,"paragraph_type":"preambular","paragraph_level":1,"prefix":null,"links":[],"textWithHighlights":"*Taking note* of the decision of 27 June 1977 of the Governing Council of the United Nations Development Programme'~ concerning the implementation of the medium-term and long-term recovery and rehabilitation programme in the Sudano-Sahelian region,","mandates":[{"action_verb":"Taking note","action_verb_normalized":"take note","action_verb_type":"observing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"683d1869-346b-5371-b7df-7b1ca4910d39","position":5,"note_ids":[],"note_references":[],"text":"DeerJ/y concerned at the magnitude of the effects of the new drought prevailing in the Sudano-Sahelian region and, in particular, at the serious shortage of food and the livestock losses,","type":"paragraph","heading_level":null,"paragraph_type":"preambular","paragraph_level":1,"prefix":null,"links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"67cc04cd-351d-52e1-81cb-89225fce22cd","position":6,"note_ids":[],"note_references":[],"text":"Taking note of the declaration adopted by the Council of Ministers of the Permanent Inter-State Committee on Drought Control in the Sahe! at its special session held at Niamey on 26 and 27 October 1977, . Mindful of the fact that the transport problem, particularly the state of the infrastructure and the inadequacy of the present capacities, constitutes a major obstacle for the countries of the region,","type":"paragraph","heading_level":null,"paragraph_type":"preambular","paragraph_level":1,"prefix":null,"links":[],"textWithHighlights":"*Taking note* of the declaration adopted by the Council of Ministers of the Permanent Inter-State Committee on Drought Control in the Sahe! at its special session held at Niamey on 26 and 27 October 1977, . Mindful of the fact that the transport problem, particularly the state of the infrastructure and the inadequacy of the present capacities, constitutes a major obstacle for the countries of the region,","mandates":[{"action_verb":"Taking note","action_verb_normalized":"take note","action_verb_type":"observing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"ce69fb5a-8ca0-5bf4-a984-2b246e2a743e","position":7,"note_ids":[],"note_references":[],"text":"Noting the measures taken by the Food and Agriculture Organization of the United Nations and the World ~ood Programme to establish large stockpiles of food 111 the ports of the Sudano-Sahelian region,","type":"paragraph","heading_level":null,"paragraph_type":"preambular","paragraph_level":1,"prefix":null,"links":[],"textWithHighlights":"*Noting* the measures taken by the Food and Agriculture Organization of the United Nations and the World ~ood Programme to establish large stockpiles of food 111 the ports of the Sudano-Sahelian region,","mandates":[{"action_verb":"Noting","action_verb_normalized":"note","action_verb_type":"observing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"3d0c55e1-ba8b-5766-9e1d-ad5ae9474388","position":8,"note_ids":[],"note_references":[],"text":"Noting the individual and collective efforts made by States members of the Permanent Inter-State Committee on Drought Control in the Sahe!,","type":"paragraph","heading_level":null,"paragraph_type":"preambular","paragraph_level":1,"prefix":null,"links":[],"textWithHighlights":"*Noting* the individual and collective efforts made by States members of the Permanent Inter-State Committee on Drought Control in the Sahe!,","mandates":[{"action_verb":"Noting","action_verb_normalized":"note","action_verb_type":"observing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"9b61f404-53fa-5692-a1cd-5a9d2caf1390","position":9,"note_ids":[],"note_references":[],"text":"N oti~1g with '.~atisfaction the decisive role played by the Umtt.:d Nations Sahelian Office, on the one hand,","type":"paragraph","heading_level":null,"paragraph_type":"preambular","paragraph_level":1,"prefix":null,"links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"7e859200-4348-5b80-bc9b-2895a1f37ead","position":10,"note_ids":[],"note_references":[],"text":"71 Official Records of tire Economic and Social Council Sixt_,·-tlr ·,-d Session, Suprlcment No. 2A ( E/6004), chap. 1: sect. B. and E/6004/Ad<l. I.","type":"paragraph","heading_level":null,"paragraph_type":"preambular","paragraph_level":1,"prefix":null,"links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"7674b275-2322-5205-aa90-1177956bd2d7","position":11,"note_ids":[],"note_references":[],"text":",-~ Ibid., Supplement No. 3 A ( E/6013 /Rev. I), para. 165.","type":"paragraph","heading_level":null,"paragraph_type":"preambular","paragraph_level":1,"prefix":null,"links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"fb58caf0-6ba7-5e97-8532-703ebcb928d4","position":12,"note_ids":[],"note_references":[],"text":"in helping to combat the effects of the drought and to implement the priority medium-term and long-term recovery and rehabilitation programme adopted by the States members of the Permanent Inter-State Committee on Drought Control in the Sahe!, and, on the other hand, in mobilizing the necessary resources to finance priority projects,","type":"paragraph","heading_level":null,"paragraph_type":"preambular","paragraph_level":1,"prefix":null,"links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"38c6ce10-bfcd-52ab-82a8-6de340697a20","position":13,"note_ids":[],"note_references":[],"text":"Taking note of the expansion of the recovery and rehabilitation programme in the Sabel as a result of the adoption by the Council of Ministers of the Permanent Inter-State Committee on Drought Control in the Sahe!, meeting at Ouagadougou from 25 to 28 April 1977, of the drought control and development strategy and programme for the SaheL","type":"paragraph","heading_level":null,"paragraph_type":"preambular","paragraph_level":1,"prefix":null,"links":[],"textWithHighlights":"*Taking note* of the expansion of the recovery and rehabilitation programme in the Sabel as a result of the adoption by the Council of Ministers of the Permanent Inter-State Committee on Drought Control in the Sahe!, meeting at Ouagadougou from 25 to 28 April 1977, of the drought control and development strategy and programme for the SaheL","mandates":[{"action_verb":"Taking note","action_verb_normalized":"take note","action_verb_type":"observing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"e8d13941-e5c0-5131-bfa3-c7fd6729708f","position":14,"note_ids":[],"note_references":[],"text":"Considering that the nature and magnitude of the needs of the countries of the Sudano-Sahelian region, which are among the least developed countries, make it necessary for the international community to continue and to strengthen its action of solidarity in support of the recovery efforts and economic development of those countries,","type":"paragraph","heading_level":null,"paragraph_type":"preambular","paragraph_level":1,"prefix":null,"links":[],"textWithHighlights":"*Considering* that the nature and magnitude of the needs of the countries of the Sudano-Sahelian region, which are among the least developed countries, make it necessary for the international community to continue and to strengthen its action of solidarity in support of the recovery efforts and economic development of those countries,","mandates":[{"action_verb":"Considering","action_verb_normalized":"consider","action_verb_type":"observing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"8837186e-43cc-59e1-93a8-f7fabb2c6776","position":15,"note_ids":[],"note_references":[],"text":"Having considered the reports of the Secretary- General on the implementation of the medium-term and long-term recovery and rehabilitation programme in the Sudano-Sahelian region,73","type":"paragraph","heading_level":null,"paragraph_type":"preambular","paragraph_level":1,"prefix":null,"links":[],"textWithHighlights":"*Having considered* the reports of the Secretary- General on the implementation of the medium-term and long-term recovery and rehabilitation programme in the Sudano-Sahelian region,73","mandates":[{"action_verb":"Having considered","action_verb_normalized":"consider","action_verb_type":"observing","assignees":[],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"c82bafda-41a9-513c-8a4a-c9267e5124b0","position":16,"note_ids":[],"note_references":[],"text":"I","type":"heading","heading_level":1,"paragraph_type":null,"paragraph_level":null,"prefix":null,"links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"6b1dafa3-da8f-5810-8873-209b1a2d3663","position":17,"note_ids":[],"note_references":[],"text":"Urges Governments, United Nations agencies and intergovernmental organizations to respond immediately to the appeal made by the Council of Ministers of the Permanent Inter-State Committee on Drought Control in the Sahel at its special session held at Niamey, in particular by taking emergency measures to meet the requirements for food aid specified in the declaration","type":"paragraph","heading_level":null,"paragraph_type":"operative","paragraph_level":1,"prefix":"1.","links":[],"textWithHighlights":"*Urges* <<Governments, United Nations agencies and intergovernmental organizations>> to respond immediately to the appeal made by the Council of Ministers of the Permanent Inter-State Committee on Drought Control in the Sahel at its special session held at Niamey, in particular by taking emergency measures to meet the requirements for food aid specified in the declaration","mandates":[{"action_verb":"Urges","action_verb_normalized":"urge","action_verb_type":"directive","assignees":[{"assignee":"Governments, United Nations agencies and intergovernmental organizations","assignee_normalized":"Governments","assignee_type":"member_states"}],"mentioned_entities":[],"deliverables":[]}],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"cd893931-7c0d-5989-b659-a5db24c63464","position":18,"note_ids":[],"note_references":[],"text":"adopted at Niamey;","type":"paragraph","heading_level":null,"paragraph_type":null,"paragraph_level":null,"prefix":null,"links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"aaeabc30-9716-559a-a26e-82e53519708d","position":19,"note_ids":[],"note_references":[],"text":"IMPLEMENTATION OF THE MEDIUM-TERM AND LONG- TERM RECOVERY AND REHABILITATION PROGRAMME","type":"footnote","heading_level":null,"paragraph_type":null,"paragraph_level":null,"prefix":null,"links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"},{"extraction_quality_warning":false,"id":"03ed5b2b-6d85-5ee6-965b-3ad7541075f0","position":20,"note_ids":[],"note_references":[],"text":"EMERGENCY MEASURES","type":"footnote","heading_level":null,"paragraph_type":null,"paragraph_level":null,"prefix":null,"links":[],"section":"main","text_index":1,"parser_version":"sem-v5","source":"digitallibrary"}]},"versionHistory":null,"reports":{"status":"included","data":{"source":"union","data":{"pageOneAccepted":true,"reports":[]}}},"relatedDocuments":{"status":"not_included"}}}}